BUSINESS MODEL OF RISKS EVALUATION OF PROJECTS
A. I. Orlov, A. D. Tsisarskiy
Bauman Moscow State Technical University 5/1, 2-ya Baumanskaya Str., Moscow, 105005, Russian Federation
When modeling the life cycle of the program for the creation of science-intensive products, it is necessary to take into account the risks which are specific for the creation of rocket and space technology. In this article we offer the new kind of organizational and economic models for estimation the risks of projects for creating rocket and space technology. In it, for the first time, we consider the generalization of the additive-multiplicative model of risk estimation. In a two-level scheme at the lower level, risk assessments are combined additively, at the top level – multiplicatively. We use the additive-multiplicative model to estimate the risks of projects for creating rocket and space technology. There are 44 private risks at the lower level and 8 at the top, respectively, the stages of project implementation. The additive-multiplicative model is also useful for solving other problems of risk estimation. We applied it to estimate the risks of implementing innovative projects in universities (with the participation of external partners) and to estimate the risks in the release of new innovative products. We consider successively the main elements of a new model of risk estimation models: a hierarchical risk system, an expert risk estimation of the lower level, an aggregation of the risks in the lower group to calculate the higher-level group risk, use of the estimation results for risk management, the consequences of the failure of terms and methods for overcoming them. For the creation of a hierarchical system of risks, the next step is the construction and application of a low-level expert risk estimation (private risk) system. It is natural for an expert to use non-numerical characteristics for estimation, so it is natural to give the risk estimations of a specific project for creating rocket and space technology using linguistic variables. Values of linguistic variables we can obtain directly from experts in the form of scores from the series 0, 1, 2, 3, 4, 5. With further development of the organizational and economic model of risk estimation of projects for the purpose of in-depth description of uncertainties, other mathematical tools based on theory of fuzzy sets and interval mathematics can be used. Perspective methods of aggregating risk estimations assume the use of weighted Kolmogorov's means, weighted medians I and II types. Estimation results we use in risk management. The approach and the mathematical model which we develop in this article can be useful for project managers who carry out their activities in the rocket and space industry.
Keywords: risk, estimation, modeling, projects, rocket and space technology, probability, expert procedures.
References

1. Innovative Russia – 2020 (Strategy of Innovative Development of the Russian Federation for the period up to 2020). Moscow, Government of the Russian Federation, 2011. 148 p.

2. Raykunov M. et al. Ekonomika razvitiya kosmicheskoy deyatel’nosti [Development of space activity economics]. Moscow, Fizmatlit Publ., 2013, 600 p.

3. Orlov A. I. [Organizational and economic support of space industry]. Nauchnyy zhurnal KubGAU. 2016, No. 120, P. 86–114 (In Russ.).

4. Orlov A. I., Lucenko E. V., Lojko V. I. Organizatsionno-ekonomicheskoe, matematicheskoe i programmnoe obespechenie kontrollinga, innovatsiy i menedzhmenta [Organizational-economic, mathematical and software controlling, innovation and management]. Krasnodar, KubGAU, 2016, 600 p.

5. Khrustalev E. Yu., Khrustalev O. E. [Modeling of life cycle of the program of creation of the knowledgeintensive production]. Ekonomicheskiy analiz: teoriya i praktika. 2012, No. 16 (271), P. 2–12 (In Russ.).

6. Grachev I. D., Fionov A. S. [Development of technology of adaptive management of project of creation, operation and utilization of space rocket technology]. Natsional’nye interesy: prioritety i bezopasnost’. 2012, No. 42 (183), P. 2–14 (In Russ.).

7. Tsisarskiy A. D. [Increase of efficiency of implementation of projects on creation of perspective samples of missile and space equipment on basis of requirements engineering concept]. Natsional’nye interesy: prioritety i bezopasnost’. 2013, No. 31 (220), P. 25–29 (In Russ.).

8. Orlov A. I., Tsisarskiy A. D. [Features of risk assessment to create rocket and space technology]. Natsional’nye interesy: prioritety i bezopasnost’. 2013, No. 43 (232), P. 37–46 (In Russ.).

9. Orlov A. I. [Additive-multiplicative model for risk estimation in the production of rocket and space technics]. Nauchnyy zhurnal KubGAU. 2014, No. 102, P. 78–111 (in Russ.).

10. Orlov A. I., Tsisarskiy A. D. [Additivemultiplicative model of risk evaluation and its application in process of developing innovative-investment projects of space-rocket technique creation]. Problemy upravleniya bezopasnost’yu slozhnykh sistem: Trudy XXI Mezhdunarodnoy konferentsii [Problems of complicated system security management: Proc. XXI Int. Conf.]. Moscow, RSUH Publ., 2013, P. 394–398 (In Russ.).

11. Orlov A. I. Tsisarskiy A. D. [Special aspects risk evaluation in process of realization innovative-investment projects in space sector]. Aktual’nye problemy rossiyskoy kosmonavtiki. Materialy XXXVIII Akademicheskikh chteniy po kosmonavtike [Topical issues of Russian cosmonautics. Proc. XXXVIII Academic readings on cosmonautics]. Moscow, RAS committee on scientific heritage development of space pioneers, 2014, P. 210–210 (In Russ.).

12. Orlov A. I. Organizatsionno-ekonomicheskoe modelirovanie. Ch. 2. Ekspertnye otsenki [Business modelling. P. 2. Expert estimate]. Moscow, Bauman MSTU Publ., 2011, 486 p.

13. Saati T. L. Prinyatie resheniy. Metod analiza ierarkhiy [Decision making. Analytic hierarchy process]. Moscow, Radio i svyaz’, Publ., 1989, 316 p.

14. Podinovskij V. V., Podinovskaja O. V. [On the incorrectness of the analytic hierarchy process]. Problemy upravleniya. 2011, No. 1, P. 8–13 (In Russ.).

15. Podinovskij V. V., Podinovskaja O. V. [Once again about the incorrectness of the Analytic hierarchy process]. Problemy upravleniya. 2012, No. 4, P. 75–78 (In Russ.).

16. Orlov A. I. Organizatsionno-yekonomicheskoe modelirovanie. Ch. 1: Nechislovaja statistika. [Business modelling. P. 1. Nonnumerical statistics]. Moscow, Bauman MSTU Publ., 2009, 542 p.

17. Orlov A. I., Lucenko E. V. Sistemnaya nechetkaya interval’naya matematika [System of fuzzy interval mathematics]. Krasnodar, KubGAU Publ., 2014, 600 p.

18. Zade L. A. Ponyatie lingvisticheskoy peremennoy i ego primenenie k prinyatiyu priblizhennykh resheniy [Concept of linguistic variable and its application in making approximate decisions]. Moscow, Mir Publ., 1976,165 p.

19. Orlov A. I. Ustojchivost’ v sotsial’nojekonomicheskikh modeljakh [Stability in socio-economic models]. Moscow, Nauka Publ., 1979. 296 p.

20. Orlov A. I. Teoriya prinyatiya resheniy [Decision making theory]. Moscow, Ekzamen Publ., 2006, 576 p.

21. Lyndina M. I., Orlov A. I. [Mathematical theory of ratings]. Nauchnyy zhurnal KubGAU [Scientific Journal of KubSAU]. 2015, No. 114, P. 1–26.

22. Khrustalev S. A., Orlov A. I., Sharov V. D. [Mathematical methods for estimating the effectiveness of management decisions]. Zavodskaya laboratoriya. Diagnostika materialov. 2013, Vol. 79, No. 11, P. 67–72 (In Russ.).


Orlov Alexander Ivanovich – Dr. Sc. (Eng.), Dr. Sc. (Econom.), Cand. Sc. (Phys.-Math.), professor of Bauman

Moscow State Technical University. E-mail: prof-orlov@mail.ru.

Tsisarskiy Alexander Dmitrievich – Cand. Sc., Docent, Bauman Moscow State Technical University. E-mail:

93105948@tsniimash.ru.